- What is a change request?
- A change request (also called an RFC, a Request For Change) is a written record of a change to a production system: what is changing and why, how it will be done, how it will be undone if it goes wrong, who approved it, and how it turned out. Decuga keeps that record from the first draft to the final review.
- Which plan includes change management?
- The Business plan, from $57 a month for up to 50 team members, billed flat per account. There is a one-week free trial, and no card is needed to start it.
- What is the difference between Standard, Normal and Emergency changes?
- A Standard change is routine, low-risk and pre-authorised by your policy, so it does not need an approval cycle. A Normal change needs a full assessment and sign-off from the required number of approvers. An Emergency change is an urgent fix for a production incident: a single approver is enough to start it, and the full documentation and review follow afterwards.
- How many people have to approve a change?
- You decide. The default is one approval, and you can raise it up to the number of people who can approve. You can also require approvals from Change Managers, who check that the change has what it needs to be carried out and rolled back. The person who created a change cannot approve it, and a rejection needs a comment.
- Is a rollback plan required?
- Yes. The description, execution plan and rollback plan are required to create a change, and they can be edited but never emptied. A change cannot be submitted for approval without them.
- Can I schedule a change for a maintenance window?
- Yes. A change can carry a scheduled window with a start and an end, shown in the time zone you set, so everyone sees when it is allowed to happen.
- Does it work with my CI/CD pipeline?
- A pipeline that uses a project API key can report the outcome of its own deployment, so a change can move to Completed or Failed from the pipeline instead of by hand.
- Does it make us compliant with ITIL, ISO 27001 or similar frameworks?
- No tool can do that on its own, and we do not claim certification. Decuga gives you the records those frameworks ask for: approvals, risk, rollback plans, timestamps and who did what. Whether that satisfies your auditor depends on your own process, and a team that needs a validated system should confirm requirements with its quality or compliance lead.
- Can I link a change to the work and the incident behind it?
- Yes. You pick the tasks (those in progress, in the current sprint or in a section) and the tickets (until they are resolved) that the change relates to. The links stay on the change afterwards, so the trail runs from the incident to the fix to the deployment.