Change management · Business plan

Change requests that are planned, approved and reversible

A structured RFC workflow for every production change: the right approvers, a risk assessment, a rollback plan written in advance, a maintenance window, and a review afterwards. All of it linked to the tasks and tickets behind the change.

One-week free trial of the Business plan. No card needed.

What you get

A change process people will actually follow

Heavy process gets ignored. Decuga keeps the record complete and the steps short: required fields where they matter, templates for repeat work, and approvals that go to the right people.

  • Three change types

    Standard for routine, pre-approved work. Normal for planned changes that need sign-off. Emergency for urgent fixes, with a single approver and a full review afterwards.

  • Risk, blast radius and affected systems

    Rate each change Low, Medium, High or Critical, and record the systems and services it touches and who is affected if it goes wrong.

  • Execution and rollback plans

    A description, an execution plan and a rollback plan are required to create a change, so nothing reaches approval without them. They are written in the same rich text editor as a task description.

  • Multi-approver sign-off

    Require as many approvals as the change deserves, and optionally approvals from Change Managers too. Each decision is recorded with a timestamp, and a rejection needs a reason.

  • Maintenance windows

    Schedule when a change may happen with a start and an end in your time zone, and see what is planned across the project.

  • Linked tasks and tickets

    Connect the change to the sprint tasks that make it and the support tickets that caused it, so the trail is complete in both directions.

  • Templates for recurring work

    Start from five built-in templates (Emergency Hotfix, Database Maintenance, Infrastructure Scaling, Security Patch, Feature Flag Toggle) or save your own. Everything is editable.

  • Post-implementation review

    After a change is completed or rolled back, record whether it succeeded, what you learned and whether the system is back to normal. Reviews are kept on the change permanently.

  • Rollback you can trace

    When a change is rolled back, Decuga records why, who did it, when, how long it took and whether the system is confirmed back to normal. A completed change that needs undoing gets a linked emergency change.

  • A full audit trail

    Every edit, status change, approver and decision is listed with who did it and when. Discussion continues in comments, even after the change is closed.

  • Notifications where people work

    Approvers and the author are told when a change is submitted, approved, rejected, completed, failed or rolled back, in the app and in a Slack channel you choose.

  • Pipeline and assistant friendly

    A CI/CD pipeline with a project API key can report a deployment’s outcome. The Decuga assistant, in the app, Slack or an AI client, can create changes and move them through approval.

Change types

Match the approval to the risk

The type of a change decides how it is approved, not the other way round. Most teams run mostly Standard and Normal changes, and keep Emergency for real incidents.

Change types in Decuga and what each requires
TypeWhat it isExamplesApproval
StandardPre-approved, repeatable, low risk. Pre-authorised by policy, so no approval cycle.A routine configuration change to a known-stable path; a scheduled dependency version bump.None: it is recorded and carried out
NormalA planned change that needs a full assessment before it goes ahead.A third-party integration change; a schema migration; a new service in production.The required number of approvers, plus Change Managers if you turn them on
EmergencyAn expedited fix for a production incident. Implement first, document and review after.A production hotfix during an active incident; rolling back a bad release; data corruption remediation.One approver is enough to begin; the full review compensates

The workflow

From draft to review, with rules that cannot be skipped

A change moves along a defined path, and the rules are the same whether you change the status in the app or through the API.

  1. 1

    Draft

    Prepare the change. Edit freely, link the tasks and tickets, and start from a template if one fits.

  2. 2

    Pending approval

    Submit for approval. The required approvers are asked, and each decides for themselves. The author cannot approve their own change.

  3. 3

    Approved or rejected

    It is approved as soon as the required number agree. A rejection needs a comment, and the change can go back to Draft to be revised.

  4. 4

    In progress

    Carry the change out in the scheduled window. The start time is recorded.

  5. 5

    Completed, failed or rolled back

    Record the outcome. A failed change can be rolled back using the documented plan, with the reason and timings recorded.

  6. 6

    Review

    A post-implementation review captures what happened and what to do differently, and stays on the record.

Editing resets approval. If you change the details of a change that is waiting or approved, it goes back to Draft and the approvals are cleared, so nobody approves something that was altered afterwards.

Completed changes are locked. The details become read-only once a change is in progress. If a completed change must be undone, you open a linked Emergency rollback change.

A person cannot approve their own change. Each approver decides only for themselves, and a rejection must say why.

Anatomy of a change request

What goes in a change, and why a reviewer wants it

These are the fields on a change request. The description, execution plan and rollback plan are required, and can be edited but never emptied.

Fields of a Decuga change request
FieldWhat goes in itWhy it matters
Title and descriptionWhat is changing, why it is needed, and what it modifies in production.Ties the change to a reason and a requirement
Change typeStandard, Normal or Emergency.Decides the approval path
Risk levelLow, Medium, High or Critical.Shows the approval effort matched the risk
Affected systems and services, blast radiusWhich systems it touches and who is affected if it fails.Lets approvers judge impact
Execution planThe steps to carry the change out.Shows it was planned, not improvised
Rollback planHow to undo it, and how you will know it needs undoing.The first thing reviewers check on a risky change
Scheduled windowWhen it may happen, with start and end.Keeps changes out of sensitive hours
Linked tasks and ticketsThe work and the incidents behind it.Traceability from incident to deployment
AssigneeWho carries it out.One accountable owner

Approvals

The right people, the right number

Approval should scale with risk. Set the numbers once for the project and every change carries the number that applied when it was submitted.

Project approvers

  • Members who can manage the project and approve changes are asked when a change is submitted
  • You set how many approvals are required, from one up to the number of approvers
  • A change is approved as soon as that many agree, and the rest do not have to
  • By default one rejection is enough; a project can instead wait until the required approvals can no longer be reached

Change Manager approvals (optional)

  • A second layer for projects that want a dedicated reviewer of change quality
  • Change Managers check that the change has what it needs to be carried out and rolled back
  • Off by default; when on, you choose how many are needed, and a change needs both kinds
  • A person counts as one kind of approver, never both

Use cases

Where change management earns its place

Any change that can hurt production, customers or an audit deserves a record. These are the situations where teams get the most from it.

Engineering and SRE teams

Production deployments with a paper trail

Every deployment that can break something is a change request: planned, approved by the right people, scheduled, and reviewed afterwards.

  • Rollback plan written before approval, not during an incident
  • Deployment and rollback durations recorded
  • Pipeline can report the outcome

Database and platform teams

Migrations and maintenance windows

Schema migrations, index rebuilds and infrastructure scaling are high-consequence and easy to forget. Give each a window, a plan and an owner.

  • Database Maintenance and Infrastructure Scaling templates
  • Scheduled window in your time zone
  • Affected systems and blast radius documented

Incident response

Emergency fixes that are still accountable

In an incident you do not wait for a committee. An Emergency change needs one approver to start, and the review afterwards makes sure nothing is lost.

  • Emergency Hotfix template with a critical-risk starting point
  • Linked to the ticket that reported the incident
  • Full post-implementation review

Teams under audit or regulation

Evidence of control without extra paperwork

Who approved what, when, with what risk assessment and what rollback plan: the record builds itself as the change moves along.

  • Timestamps and names on every decision
  • Activity history on each change
  • No certification claimed: you supply the process, we keep the record

E-commerce and seasonal businesses

A change freeze that survives real incidents

During a freeze, only approved changes and emergency fixes reach production, and each one is recorded for the review afterwards.

  • Require two approvers near peak
  • Emergency path for real incidents
  • A list of every change made during the freeze

Agencies and consultancies

Client approvals for production work

When you change a client’s system, a change request is your proof that the work was planned, agreed and reversible.

  • Rollback plan reviewed before the change
  • Approvals recorded with names and times
  • Linked to the ticket the client raised

Part of one workspace

Connected to the work, the incident and the release

Because change management shares an account with project management and the service desk, the trail is never copied by hand.

  • Tasks and sprints

    Link the tasks that make the change, and see the change from the task.

  • Service desk tickets

    Link the ticket that reported the incident, so support, engineering and approvers see the same thing.

  • Code and releases

    Branches and pull requests link to tasks through GitHub and GitLab, and a pipeline can report the deployment outcome.

  • Assistant and Slack

    Ask the assistant to draft a change, check what is waiting for approval, or approve it, from the app, Slack or an AI client.

Plans

Included in Business, at a flat price

Change management is part of the Business plan, with the SLAs, company accounts and analytics of the service desk. The price is per account, not per approver, and every paid plan has a one-week free trial with no card.

Business

From $57 / month, flat

Up to 50 team members, scaling to 500

  • Change management: types, approvals, risk, rollback, review
  • Change templates and scheduled windows
  • SLA rules, company accounts and service desk analytics
  • Changelog and public release notes, roadmap with voting
  • Everything in Pro

Pro

$28 / month, flat

Up to 20 team members

  • Service desk, customer portal and forms
  • Epics, analytics and sprint retrospectives
  • Ticket automations
  • Upgrade to Business to add change management

Prices in US dollars, per month, before tax. See the pricing page for every plan and for larger team sizes.

Change management questions

What is a change request?
A change request (also called an RFC, a Request For Change) is a written record of a change to a production system: what is changing and why, how it will be done, how it will be undone if it goes wrong, who approved it, and how it turned out. Decuga keeps that record from the first draft to the final review.
Which plan includes change management?
The Business plan, from $57 a month for up to 50 team members, billed flat per account. There is a one-week free trial, and no card is needed to start it.
What is the difference between Standard, Normal and Emergency changes?
A Standard change is routine, low-risk and pre-authorised by your policy, so it does not need an approval cycle. A Normal change needs a full assessment and sign-off from the required number of approvers. An Emergency change is an urgent fix for a production incident: a single approver is enough to start it, and the full documentation and review follow afterwards.
How many people have to approve a change?
You decide. The default is one approval, and you can raise it up to the number of people who can approve. You can also require approvals from Change Managers, who check that the change has what it needs to be carried out and rolled back. The person who created a change cannot approve it, and a rejection needs a comment.
Is a rollback plan required?
Yes. The description, execution plan and rollback plan are required to create a change, and they can be edited but never emptied. A change cannot be submitted for approval without them.
Can I schedule a change for a maintenance window?
Yes. A change can carry a scheduled window with a start and an end, shown in the time zone you set, so everyone sees when it is allowed to happen.
Does it work with my CI/CD pipeline?
A pipeline that uses a project API key can report the outcome of its own deployment, so a change can move to Completed or Failed from the pipeline instead of by hand.
Does it make us compliant with ITIL, ISO 27001 or similar frameworks?
No tool can do that on its own, and we do not claim certification. Decuga gives you the records those frameworks ask for: approvals, risk, rollback plans, timestamps and who did what. Whether that satisfies your auditor depends on your own process, and a team that needs a validated system should confirm requirements with its quality or compliance lead.
Can I link a change to the work and the incident behind it?
Yes. You pick the tasks (those in progress, in the current sprint or in a section) and the tickets (until they are resolved) that the change relates to. The links stay on the change afterwards, so the trail runs from the incident to the fix to the deployment.

Make every production change planned, approved and reversible

Start a one-week trial of the Business plan and run your next deployment through a change request.