Scrum Updates

A standup for each team member, built from what they did on tasks

A scrum update answers the standup question for one person over a few days: which tasks did they work on, what did they do on each, and where does each task stand now. Decuga builds it from the project's activity, so it shows what was done in the app, not what someone remembers or writes up.

You can read it on a screen in Sprint Tasks, or ask your AI assistant for it through the MCP server. Both give the same update.

Scrum Updates need the Starter plan or above, the same as the activity feed they are made from.

Opening it

Open Sprint Tasks in the sidebar and choose the Scrum Updates tab. It sits just before Retrospectives. You need permission to create or update tasks to see it.

ControlWhat it does
Team memberWhose update to show. It starts with you. Active members of the project are listed first, then the project's API keys, each as the key's name followed by (API), for example alert-system (API).
DaysThe window to look at: since the last working day, today, the last 7 days, or days you choose.
Copy as textPuts the update on your clipboard as plain text, ready to paste into a chat or a standup note.
Get it nowWorks the update out again instead of using the one kept for the last hour. See the cache, below.

Reading an update

Data is cached for 1 hour, so it can be up to 1 hour behind. Worked out at 4:07 PM (just now) Get it now
Priya 17 Nov - 18 Nov · 2 tasks, 5 actions, 1 completed
DONE (1)
SP-2 Write release notes Completed
  • Edited the description
  • Moved from To Do to Done
IN PROGRESS (1)
SP-1 Fix login redirect Overdue
  • Moved from To Do to In Progress
  • Changed the story points from 3 to 5
  • Changed the priority from HIGH to CRITICAL

Each task the person worked on is one card:

PartWhat it shows
Top lineThe person, the days, and the totals: tasks worked on, actions taken, and how many tasks they completed or created.
TaskThe code and title as the task is now. Click the title to open the task.
Where it stands nowIts stage, priority, story points, sprint, epic, assignee and due date, today. A due date that has passed on a task that is not done is marked Overdue.
What they didTheir own actions on the task, oldest first, each as a sentence with the time: "Moved from To Do to In Progress", "Changed the story points from 3 to 5", "Assigned the task to Sam".
Completed, CreatedMarks a task the person moved to done, or created, in the window.
DeletedA task that has been deleted since is still listed, from its activity, and marked as deleted.

Only the person's own actions are listed. What other people did on the same task is not part of their update.

Choosing the days

ChoiceCovers
Since last working day (the default)The last working day up to now. On a Tuesday that is Monday and Tuesday. On a Monday it reaches back to Friday, so the weekend is included.
TodayToday only.
Last 7 daysThe last seven days, today included.
Choose daysAny start and end day. Both days are included, the end day cannot be in the future, and the window can be at most 31 days.
Days are counted in your time zone, the one in your profile, and both ends are whole days. Someone in another time zone looking at the same update sees the same days in theirs.

How tasks are grouped

Tasks are grouped as a standup reads, by where each one stands now (its stage), not by what was done to it:

GroupWhich tasks
DoneTasks in a done stage, or marked done.
In progressTasks in any stage after the first, such as a hold or a review stage, and tasks marked in progress.
Not startedTasks still in the project's first stage.
DeletedTasks that no longer exist.

Stage names are the ones your project uses, including stages you have added or renamed. A list shows the 50 tasks most recently worked on; the totals at the top count every task.

What is counted

An update is made from the project's activity feed, so it includes what the feed records about tasks: creating, renaming, moving between stages, changing status, assignee, priority, points, dates, sprint, epic, release, tags and links to documents, and deleting. It also includes the comments the person wrote on tasks: each shows as “Commented” (or “Replied” to another comment) with a short excerpt, and the update's figures count them. A task the person only commented on is listed, with where it stands now.

Time logged is not included, and neither are comments on anything but tasks. Comments on tickets, epics or documents are not part of an update, and a comment that has since been deleted cannot be shown. Work that was only talked about, or done outside Decuga, does not appear either. Use the update as the record of what changed in the app, and ask the person for the rest.

A window with a great deal of activity can be longer than Decuga reads in one go (the most recent 5,000 events). If so, the update says that the oldest of it is missing; choose fewer days for the whole picture.

The one-hour cache

To keep it fast, Decuga keeps each update for one hour. The same person and days asked for again within the hour get the update that was worked out the first time, so it can be up to an hour behind what has been done in the app.

WhereWhat it tells you
On the screenA notice at the top: "Data is cached for 1 hour, so it can be up to 1 hour behind", with when this update was worked out and how long ago.
In your AI assistantThe result starts with a note saying the same, how old this update is, and how to get a fresh one.

Press Get it now on the screen, or ask your assistant to refresh, to work the update out again straight away. The new one replaces the kept one, so the next person to look sees it too.

In your AI assistant (MCP)

Connected through the MCP server, your assistant has a read-only tool, get_scrum_update, that returns the same update. It is a tool, not a screen: ask in your own words.

AskWhat happens
"Give me my standup update"Your update for the last working day up to now.
"What did Priya work on yesterday?"The assistant finds Priya in the project's members and asks for her update for yesterday.
"What has Sam done since Friday?"An update for Sam from Friday to today.
"Refresh it"The assistant asks again with refresh set, to get a fresh update instead of the kept one.
ArgumentMeaning
project_idThe project, as for every MCP tool. The assistant works it out from your projects.
userIdThe team member. Left out, it is you.
apiKeyThe name of an API key, instead of a team member, for what was done through the REST API with that key.
fromFirst day, yyyy-MM-dd. Left out, it is the last working day.
toLast day, yyyy-MM-dd, included. Left out, it is today.
refreshTrue to skip the one-hour cache and work the update out now.
The result starts with a note that the data is cached, so your assistant can tell you when an update is not live. If you need the very latest, ask it to refresh.

Who can see it

QuestionAnswer
Who can open the tab?Members who can create or update tasks, on the Starter plan or above.
Whose update can I see?Any active member of the project. Anyone who can see the project's activity feed can already see what each person did, and an update is that activity arranged by person.
Can I see someone outside the project?No. The person has to be an active member of the project.
Where does work done through the API go?To the API key, not to the person who made the key. A person's update leaves out what was done with their keys, and each key has an update of its own, named with (API) after it, so an integration's tasks and comments are not counted as someone's own work.
Can I change an update?No. It is a view of what was done, not a document. To change it, change the tasks.

Plan requirements

FeatureFreeStarterProBusiness
Scrum Updates screen-✓✓✓
get_scrum_update in AI chat and MCP-✓✓✓
On the Free plan the tab shows an upgrade prompt, and the tool and the API answer with an upgrade message.

FAQ

Why is a task I worked on missing?

Only actions the activity feed records on tasks are counted. If all you did was log time, comment on something other than a task, or work outside Decuga, there is nothing to show. If the window was very busy, the update says its oldest activity is missing.

Why does the update not show what I just did?

Updates are kept for an hour. Press Get it now, or ask your assistant to refresh, to work it out again.

Why is a task in progress when its status says New?

Tasks are grouped by their stage. Moving a task to an in-progress stage does not change its status field, so the stage is a better guide to where it stands.

Does it use AI?

No. An update is arranged from the activity records, with no AI call and no AI quota. Your assistant may use AI to talk about it, but that is your assistant, not Decuga.

Is the first day or the last day left out?

No. Both days are included, as whole days in your time zone.

Does it include sub-tasks?

Yes. A sub-task is a task, so work on it is listed as its own card.